Project Management and Information Technology

Unit Code: EPM5700
Unit Title: Project Management and Information Technology
Group Assignment – Marking Rubric – Stage 2: Preliminary Planning Work (Manual)

Possible
Mark
Not Shown
0
Limited
1
Basic
2
Sound
3
Complete
4
Advanced
5
Presentation, Structure and Professional style
(out of possible marks)
15
Title page, including all group participants names and
student numbers, assignment title, title of unit, unit
co-ordinator, Project plan title
5
Sentence and paragraph structure throughout project
plan
5
Spelling and grammar throughout project plan 2.5
Harvard referencing style, in-text referencing,
reference list and glossary
2.5
Introduction (out of possible marks) 15
Executive Summary 5
Identify the scope of the project (including
background)
5
Aims and objectives clearly stated 5
Project Report (out-of possible marks) 70
 Method Statement – Outline the project
methodology or technique for the project
10

Lecturer: Vinayaga Sarma – assessment rubric reviewed Nov 2018

 Develop a Work Break Down (WBS) structure
and Organization Break Down Structure
(OBS) and Responsibility Assignment Matrix
(RAM
10
 a list of tasks and work breakdown schedule
for the project including activity durations and
a project Calendar
10
 a manual PDM diagram or a Gantt Chart 10
 a list of assumptions used for the project.
 a list and cost of all resources (own and
subcontracted
10
 a budget and cost forecast as per the WBS. 10
 develop a risk register in alignment with RBS
to identify and prioritize all risk associated with
this project
 Discussion on the results and conclusions
10
(100)
TOTAL

A written document and presentation will be required as part of this assessment.
GENERAL COMMENTS: